Tenant build-outs
From gray shell to opening day.
A commercial interior finished around your plan, your landlord requirements, and your move-in date.

Scope
Build the suite around the way the business works.
We turn empty or vacated suites into finished offices, retail stores, salons, cafes, and medical or dental spaces, with the drawings, permits, trades, and finish schedule moving in one direction.
- Metal stud framing, drywall, ceilings, doors, and hardware
- Flooring, lighting, and trade coordination for electrical, plumbing, and HVAC
- Architect drawings welcomed, with drawings and permits arranged for smaller jobs
Budget guidance
A light refresh typically runs $25-$45 per square foot. An office or retail build-out from a shell typically runs $70-$130 per square foot. Medical, dental, and food service projects are quoted from drawings.

Request a bid
Walk the space with us.
We schedule a walk-through within three business days, then prepare a written bid within ten business days of receiving drawings.
Request a Bid